Circuito ZFVE101
Distribuidora EdeNorte - Provincia La Vega
Mes-Año | Mar25 | Feb25 | Ene25 | Dic24 | Nov24 | Oct24 |
---|---|---|---|---|---|---|
Clasificación | C | C | C | C | C | C |
Clientes | 5591 | 5607 | 5573 | 5550 | 5578 | 5552 |
% Nivel Cobranza | 93.91% | 81.66% | 107.36% | 101.15% | 99.42% | 100.55% |
% Nivel Pérdida | 57.31% | 45.52% | 54.30% | 59.21% | 48.93% | 55.34% |
Energía Suministrada (GWh) | 2.83 | 2.16 | 2.57 | 2.81 | 2.32 | 3.03 |
Energía Facturada (GWh) | 1.21 | 1.18 | 1.18 | 1.15 | 1.18 | 1.35 |
Energía Cobrada (GWh) | 1.13 | 0.96 | 1.26 | 1.16 | 1.18 | 1.36 |
% Servicio | 98.90% | 99.29% | 94.28% | 99.57% | 98.36% | 97.64% |
% Sin Servicio | 1.10% | 0.71% | 5.72% | 0.43% | 1.64% | 2.36% |
Interrupción Programada (Hrs) | 0.00 | 0.00 | 37.00 | 0.00 | 8.00 | 8.00 |
Interrupción Ejecutada (Hrs) | 8.00 | 5.19 | 41.79 | 3.17 | 11.95 | 17.21 |
Promedio Interrupción Diarias (Hrs) | 0.26 | 0.17 | 1.37 | 0.10 | 0.39 | 0.57 |
Avenida Pedro A. Rivera (Parcial), Carretera Federico Basilis Parcial, Carretera las Lagunas, Guaco, Bayacanes Parcial, CASA CLUB LA COOPERATIVA, Guaco Los Callejones, Los Rincones Guaco, Autopista Duarte (Parcial), Guaco Los Valerios.