Circuito ZFSP01
Distribuidora EdeEste - Provincia San Pedro De Macoris
Mes-Año | Jun25 | May25 | Abr25 | Mar25 | Feb25 | Ene25 |
---|---|---|---|---|---|---|
Clasificación | A | A | A | A | A | A |
Clientes | 2016 | 2016 | 2019 | 1967 | 1286 | 1870 |
% Nivel Cobranza | 0.00% | 98.05% | 92.34% | 94.07% | 105.77% | 97.47% |
% Nivel Pérdida | 0.00% | 34.11% | 28.42% | 64.66% | 31.97% | 28.36% |
Energía Suministrada (GWh) | 0 | 5.11 | 4.71 | 4.73 | 4.24 | 4.61 |
Energía Facturada (GWh) | 0 | 3.37 | 3.37 | 1.67 | 2.88 | 3.30 |
Energía Cobrada (GWh) | 0 | 3.30 | 3.11 | 1.57 | 3.05 | 3.22 |
% Servicio | 99.37% | 99.62% | 97.78% | 98.39% | 99.84% | 99.18% |
% Sin Servicio | 0.63% | 0.38% | 2.22% | 1.61% | 0.16% | 0.82% |
Interrupción Programada (Hrs) | 12.00 | 6.00 | 18.00 | 10.00 | 0.00 | 5.00 |
Interrupción Ejecutada (Hrs) | 4.60 | 2.80 | 16.23 | 11.72 | 1.13 | 5.97 |
Promedio Interrupción Diarias (Hrs) | 0.15 | 0.09 | 0.53 | 0.39 | 0.04 | 0.20 |
PROYECTO PORVENIR, PLAN PORVENIR, LOS MULTIS, VILLA CESARINA, VILLA AZUCARADA, PETROPOLIS II, PETROPOLIS I, BATEY LA ESPERANZA, RES PRADERAS DE SAN PEDRO, EL PEÑON, BATEY EL MOLENITO, BOCA DEL SOCO, EL RINCON, LA SIERRA, BATEY VILLA LOS ARADOS, BATEY EL SOCO, LAGUNA PRIETA.