Circuito ZFSA117FLU
Distribuidora EdeNorte - Provincia Santiago
Mes-Año | Jun25 | May25 | Abr25 | Mar25 | Feb25 | Ene25 |
---|---|---|---|---|---|---|
Clasificación | C | C | C | C | C | C |
Clientes | 1441 | 1441 | 1385 | 1366 | 1355 | 1332 |
% Nivel Cobranza | 0.00% | 102.72% | 94.88% | 97.97% | 94.92% | 96.47% |
% Nivel Pérdida | 0.00% | 24.10% | 10.14% | 23.07% | 12.88% | 1.74% |
Energía Suministrada (GWh) | 0 | 0.45 | 0.39 | 0.44 | 0.39 | 0.36 |
Energía Facturada (GWh) | 0 | 0.34 | 0.35 | 0.34 | 0.34 | 0.35 |
Energía Cobrada (GWh) | 0 | 0.35 | 0.34 | 0.33 | 0.32 | 0.34 |
% Servicio | 97.98% | 98.25% | 98.41% | 99.02% | 97.17% | 93.35% |
% Sin Servicio | 2.02% | 1.75% | 1.59% | 0.98% | 2.83% | 6.65% |
Interrupción Programada (Hrs) | 10.00 | 4.00 | 5.00 | 0.00 | 18.00 | 54.00 |
Interrupción Ejecutada (Hrs) | 14.72 | 12.77 | 11.58 | 7.13 | 20.64 | 48.55 |
Promedio Interrupción Diarias (Hrs) | 0.48 | 0.42 | 0.38 | 0.23 | 0.68 | 1.60 |
El Flumen, Barrio Lindo La Herradura, Los Llanos de Barrio Lindo, Guayacanal, Barrio Juan Bosch, Hato Del Yaque, Los Jimenez.