Circuito ZFAL103
Distribuidora EdeSur - Provincia Santo Domingo
Mes-Año | Mar25 | Feb25 | Ene25 | Dic24 | Nov24 | Oct24 |
---|---|---|---|---|---|---|
Clasificación | A | A | A | D | A | A |
Clientes | 182 | 182 | 183 | 184 | 187 | 188 |
% Nivel Cobranza | 0.00% | 97.53% | 112.33% | 112.23% | 98.34% | 122.64% |
% Nivel Pérdida | 0.00% | 12.27% | 33.58% | -1.03% | 5.39% | 22.70% |
Energía Suministrada (GWh) | 0 | 0.44 | 0.51 | 0.5 | 0.55 | 0.65 |
Energía Facturada (GWh) | 0 | 0.39 | 0.34 | 0.5 | 0.52 | 0.5 |
Energía Cobrada (GWh) | 0 | 0.38 | 0.38 | 0.56 | 0.52 | 0.62 |
% Servicio | 99.33% | 99.66% | 98.57% | 99.23% | 99.15% | 99.28% |
% Sin Servicio | 0.67% | 0.34% | 1.43% | 0.77% | 0.85% | 0.72% |
Interrupción Programada (Hrs) | 0.00 | 0.00 | 2.00 | 4.00 | 0.00 | 3.00 |
Interrupción Ejecutada (Hrs) | 4.89 | 2.51 | 10.44 | 5.65 | 6.21 | 5.22 |
Promedio Interrupción Diarias (Hrs) | 0.16 | 0.08 | 0.34 | 0.19 | 0.20 | 0.17 |
Zona Franca De Los Alcarrizos, Hospital Vinicio Calventi, Zona Franca Hato Nuevo, Hospital Los Americanos, Dr. Elías Santana.