Circuito YAGU102A
Distribuidora EdeSur - Provincia San Cristóbal
| Mes-Año | May16 | Abr16 | Mar16 | Feb16 | Ene16 | Dic15 |
|---|---|---|---|---|---|---|
| Clasificación | D | D | D | D | D | D |
| Clientes | 102 | 102 | 102 | 102 | 102 | 102 |
| % Nivel Cobranza | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| % Nivel Pérdida | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| Energía Suministrada (GWh) | 0 | 0 | 0 | 0 | 0 | 0 |
| Energía Facturada (GWh) | 0 | 0 | 0 | 0 | 0 | 0 |
| Energía Cobrada (GWh) | 0 | 0 | 0 | 0 | 0 | 0 |
| % Servicio | 89.70% | 58.77% | 57.29% | 60.34% | 56.58% | 59.46% |
| % Sin Servicio | 10.30% | 41.23% | 42.71% | 39.66% | 43.42% | 40.54% |
| Interrupción Programada (Hrs) | 85.00 | 280.99 | 282.00 | 266.99 | 282.00 | 302.00 |
| Interrupción Ejecutada (Hrs) | 75.17 | 300.97 | 311.80 | 289.53 | 316.98 | 295.94 |
| Promedio Interrupción Diarias (Hrs) | 2.47 | 9.89 | 10.25 | 9.52 | 10.42 | 9.73 |
Los Rieles del CAEI, Caoba de Yaguate.