Circuito YAGU102A
Distribuidora EdeSur - Provincia San Cristóbal
Mes-Año | May16 | Abr16 | Mar16 | Feb16 | Ene16 | Dic15 |
---|---|---|---|---|---|---|
Clasificación | D | D | D | D | D | D |
Clientes | 102 | 102 | 102 | 102 | 102 | 102 |
% Nivel Cobranza | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
% Nivel Pérdida | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
Energía Suministrada (GWh) | 0 | 0 | 0 | 0 | 0 | 0 |
Energía Facturada (GWh) | 0 | 0 | 0 | 0 | 0 | 0 |
Energía Cobrada (GWh) | 0 | 0 | 0 | 0 | 0 | 0 |
% Servicio | 89.70% | 58.77% | 57.29% | 60.34% | 56.58% | 59.46% |
% Sin Servicio | 10.30% | 41.23% | 42.71% | 39.66% | 43.42% | 40.54% |
Interrupción Programada (Hrs) | 85.00 | 280.99 | 282.00 | 266.99 | 282.00 | 302.00 |
Interrupción Ejecutada (Hrs) | 75.17 | 300.97 | 311.80 | 289.53 | 316.98 | 295.94 |
Promedio Interrupción Diarias (Hrs) | 2.47 | 9.89 | 10.25 | 9.52 | 10.42 | 9.73 |
Los Rieles del CAEI, Caoba de Yaguate.