Circuito UASD106
Distribuidora EdeSur - Provincia Distrito Nacional
Mes-Año | Abr24 | Mar24 | Feb24 | Ene24 | Dic23 | Nov23 |
---|---|---|---|---|---|---|
Clasificación | A | A | A | A | A | A |
Clientes | 4326 | 4326 | 4324 | 4304 | 4286 | 4285 |
% Nivel Cobranza | 0.00% | 104.49% | 95.36% | 107.12% | 112.49% | 99.74% |
% Nivel Pérdida | 0.00% | 15.78% | 0.90% | 16.47% | -4.27% | -2.75% |
Energía Suministrada (GWh) | 0 | 4.45 | 4.02 | 4.37 | 4.18 | 4.76 |
Energía Facturada (GWh) | 0 | 3.75 | 3.98 | 3.65 | 4.35 | 4.89 |
Energía Cobrada (GWh) | 0 | 3.92 | 3.8 | 3.91 | 4.9 | 4.88 |
% Servicio | 99.45% | 99.92% | 99.84% | 99.83% | 99.39% | 99.69% |
% Sin Servicio | 0.55% | 0.08% | 0.16% | 0.17% | 0.61% | 0.31% |
Interrupción Programada (Hrs) | 2.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Interrupción Ejecutada (Hrs) | 3.98 | 0.58 | 1.13 | 1.21 | 4.43 | 2.23 |
Promedio Interrupción Diarias (Hrs) | 0.13 | 0.02 | 0.04 | 0.04 | 0.15 | 0.07 |
Zona Universitaria (Parcial), La Esperilla (Parcial): Baltazar Brum desde la Máximo Gómez hasta la Dr. Cesar Dargam, Dr. Cesar Dargam desde la Baltazar Brum hasta la Av. 27 de Febrero, El Vergel, José Andrés Aybar Castellano desde la Máximo Gómez hasta casi la C/ B del Vergel, C/ La Lira desde la Dr. Cesar Dargam hasta la Pról. José Ortega y Gasset, C/ El Vergel desde la Dr. Cesar Dargam hasta la C/ B del Vergel, Av. 27 de Febrero desde la Máximo Gómez (Acera opuesta del estadio olímpico) desde la Dr. Cesar Dargam hasta la Luis Alberti, Centro Medico UCE, La Julia (parcial), La Esperilla, Los Robles, Parque Iberoamericano, Fundación Global Democracia y Desarrollo (FUNGLODE), Cuerpo de Ayudantes Militares, Universidad UFEHC, Conservatorio Nacional de Música.