Circuito UASD105
Distribuidora EdeSur - Provincia Distrito Nacional
Mes-Año | Abr25 | Mar25 | Feb25 | Ene25 | Dic24 | Nov24 |
---|---|---|---|---|---|---|
Clasificación | A | A | A | A | D | A |
Clientes | 1574 | 1575 | 1570 | 1573 | 1581 | 1571 |
% Nivel Cobranza | 96.57% | 105.47% | 92.98% | 105.81% | 114.87% | 96.12% |
% Nivel Pérdida | -2.75% | -7.91% | -6.73% | 1.88% | 3.61% | -14.70% |
Energía Suministrada (GWh) | 2.54 | 2.73 | 2.8 | 3.09 | 3.24 | 3.22 |
Energía Facturada (GWh) | 2.61 | 2.95 | 2.99 | 3.03 | 3.13 | 3.7 |
Energía Cobrada (GWh) | 2.52 | 3.11 | 2.78 | 3.21 | 3.59 | 3.55 |
% Servicio | 100.00% | 100.00% | 100.00% | 99.87% | 100.00% | 100.00% |
% Sin Servicio | 0.00% | 0.00% | 0.00% | 0.13% | 0.00% | 0.00% |
Interrupción Programada (Hrs) | 0.00 | 0.00 | 0.00 | 8.00 | 0.00 | 0.00 |
Interrupción Ejecutada (Hrs) | 0.01 | 0.00 | 0.00 | 0.97 | 0.00 | 0.00 |
Promedio Interrupción Diarias (Hrs) | 0.00 | 0.00 | 0.00 | 0.03 | 0.00 | 0.00 |
La Julia (parcial), C/ Dr. Nuñez Dominguez, Edificio Sistema 911, C/ Eduardo Vicioso, Av. Sarasota desde la C/ Fernando Valerio hasta la C/ Santo Domingo