Circuito TIRE701
Distribuidora EdeNorte - Provincia La Vega
Mes-Año | May25 | Abr25 | Mar25 | Feb25 | Ene25 | Dic24 |
---|---|---|---|---|---|---|
Clasificación | C | C | C | C | C | C |
Clientes | 2558 | 2558 | 2542 | 2538 | 2537 | 2528 |
% Nivel Cobranza | 0.00% | 93.19% | 98.13% | 82.87% | 85.53% | 96.11% |
% Nivel Pérdida | 0.00% | 38.09% | 60.15% | 38.29% | 45.44% | 36.56% |
Energía Suministrada (GWh) | 0 | 0.74 | 1 | 0.68 | 0.78 | 0.63 |
Energía Facturada (GWh) | 0 | 0.46 | 0.4 | 0.42 | 0.42 | 0.4 |
Energía Cobrada (GWh) | 0 | 0.43 | 0.39 | 0.35 | 0.36 | 0.39 |
% Servicio | 98.20% | 99.90% | 99.10% | 97.58% | 92.80% | 99.99% |
% Sin Servicio | 1.80% | 0.10% | 0.90% | 2.42% | 7.20% | 0.01% |
Interrupción Programada (Hrs) | 6.00 | 0.00 | 0.00 | 18.00 | 52.00 | 0.00 |
Interrupción Ejecutada (Hrs) | 13.15 | 0.76 | 6.54 | 17.64 | 52.53 | 0.10 |
Promedio Interrupción Diarias (Hrs) | 0.43 | 0.02 | 0.22 | 0.58 | 1.73 | 0.00 |
Tireo Arriba, Tireo al Medio, Tireo Abajo, El Café, Suriel, Portezuela, Tireo Abajo.