Circuito SPM104
Distribuidora EdeEste - Provincia San Pedro De Macoris
Mes-Año | Jun25 | May25 | Abr25 | Mar25 | Feb25 | Ene25 |
---|---|---|---|---|---|---|
Clasificación | A | A | A | A | A | A |
Clientes | 4391 | 4391 | 4356 | 4343 | 4356 | 4358 |
% Nivel Cobranza | 0.00% | 84.59% | 99.36% | 102.76% | 100.41% | 106.00% |
% Nivel Pérdida | 0.00% | 51.02% | 52.25% | 55.31% | 46.31% | 49.52% |
Energía Suministrada (GWh) | 0 | 3.58 | 3.22 | 3.35 | 2.76 | 3.06 |
Energía Facturada (GWh) | 0 | 1.76 | 1.54 | 1.50 | 1.48 | 1.54 |
Energía Cobrada (GWh) | 0 | 1.48 | 1.53 | 1.54 | 1.49 | 1.64 |
% Servicio | 98.62% | 98.52% | 99.63% | 98.66% | 98.95% | 99.37% |
% Sin Servicio | 1.38% | 1.48% | 0.37% | 1.34% | 1.05% | 0.63% |
Interrupción Programada (Hrs) | 0.00 | 0.00 | 0.00 | 8.00 | 0.00 | 3.00 |
Interrupción Ejecutada (Hrs) | 10.08 | 10.83 | 2.70 | 9.82 | 7.65 | 4.63 |
Promedio Interrupción Diarias (Hrs) | 0.33 | 0.36 | 0.09 | 0.32 | 0.25 | 0.15 |
BARRIO ENRIQUILLO, CENTRO DE LA CIUDAD, JAPÓN, LAS FLORES, LAS PIEDRAS, LOS MAESTROS, MIRAMAR, PEDRO JUSTO CARRIÓN III, PEDRO JUSTO CORRION I, PLACER BONITO, VILLA MUNICIPAL, VILLA VELÁSQUEZ, BARRIO SANTA CLARA, VILLA FARO, SAN ANTON, HAZIM.