Circuito SJUA103A
Distribuidora EdeSur - Provincia San Juan
Mes-Año | Abr25 | Mar25 | Feb25 | Ene25 | Dic24 | Nov24 |
---|---|---|---|---|---|---|
Clasificación | C | C | C | C | D | C |
Clientes | 17 | 16 | 12 | 14 | 14 | 26 |
% Nivel Cobranza | 125.47% | 123.50% | 113.57% | 71.77% | 73.26% | 193.00% |
% Nivel Pérdida | 94.04% | 94.68% | 93.80% | 93.68% | 94.39% | 95.33% |
Energía Suministrada (GWh) | 0.05 | 0.06 | 0.05 | 0.05 | 0.06 | 0.05 |
Energía Facturada (GWh) | 0 | 0 | 0 | 0 | 0 | 0 |
Energía Cobrada (GWh) | 0 | 0 | 0 | 0 | 0 | 0 |
% Servicio | 99.25% | 98.75% | 99.11% | 100.00% | 99.87% | 99.99% |
% Sin Servicio | 0.75% | 1.25% | 0.89% | 0.00% | 0.13% | 0.01% |
Interrupción Programada (Hrs) | 0.00 | 0.00 | 0.00 | 1.00 | 0.00 | 0.00 |
Interrupción Ejecutada (Hrs) | 5.45 | 9.10 | 6.48 | 0.00 | 0.95 | 0.08 |
Promedio Interrupción Diarias (Hrs) | 0.18 | 0.30 | 0.21 | 0.00 | 0.03 | 0.00 |
Bo. Mesopotamia