Circuito SJUA103A
Distribuidora EdeSur - Provincia San Juan
Mes-Año | Mar25 | Feb25 | Ene25 | Dic24 | Nov24 | Oct24 |
---|---|---|---|---|---|---|
Clasificación | C | C | C | D | C | C |
Clientes | 12 | 12 | 14 | 14 | 26 | 26 |
% Nivel Cobranza | 0.00% | 113.57% | 71.77% | 73.26% | 193.00% | 66.78% |
% Nivel Pérdida | 0.00% | 93.80% | 93.68% | 94.39% | 95.33% | 91.41% |
Energía Suministrada (GWh) | 0 | 0.05 | 0.05 | 0.06 | 0.05 | 0.05 |
Energía Facturada (GWh) | 0 | 0 | 0 | 0 | 0 | 0 |
Energía Cobrada (GWh) | 0 | 0 | 0 | 0 | 0 | 0 |
% Servicio | 98.75% | 99.11% | 100.00% | 99.87% | 99.99% | 99.86% |
% Sin Servicio | 1.25% | 0.89% | 0.00% | 0.13% | 0.01% | 0.14% |
Interrupción Programada (Hrs) | 0.00 | 0.00 | 1.00 | 0.00 | 0.00 | 0.00 |
Interrupción Ejecutada (Hrs) | 9.10 | 6.48 | 0.00 | 0.95 | 0.08 | 1.04 |
Promedio Interrupción Diarias (Hrs) | 0.30 | 0.21 | 0.00 | 0.03 | 0.00 | 0.03 |
Bo. Mesopotamia