Circuito SJUA102B
Distribuidora EdeSur - Provincia San Juan
Mes-Año | Dic17 | Nov17 | Oct17 | Sep17 | Ago17 | Jul17 |
---|---|---|---|---|---|---|
Clasificación | D | C | C | C | C | C |
Clientes | 0 | 815 | 816 | 811 | 823 | 819 |
% Nivel Cobranza | 89.78% | 45.87% | 42.15% | 21.79% | 52.95% | 54.35% |
% Nivel Pérdida | 35.50% | 54.70% | 37.76% | 54.11% | 57.20% | 46.82% |
Energía Suministrada (GWh) | 0.14 | 0.15 | 0.11 | 0.15 | 0.15 | 0.12 |
Energía Facturada (GWh) | 0 | 0.07 | 0.07 | 0.07 | 0.07 | 0.07 |
Energía Cobrada (GWh) | 0 | 0.03 | 0.03 | 0.01 | 0.03 | 0.04 |
% Servicio | 0.00% | 61.98% | 57.27% | 88.71% | 79.03% | 59.82% |
% Sin Servicio | 0.00% | 38.02% | 42.73% | 11.29% | 20.97% | 40.18% |
Interrupción Programada (Hrs) | 0.00 | 270.99 | 282.99 | 250.00 | 266.00 | 272.99 |
Interrupción Ejecutada (Hrs) | 0.00 | 277.53 | 311.93 | 82.43 | 153.09 | 293.31 |
Promedio Interrupción Diarias (Hrs) | 0.00 | 9.12 | 10.26 | 2.71 | 5.03 | 9.64 |
Mogollón (parcial), El Batey, Maria Dionicio, San Ramón, Batey Chiquito, Las Ahuyamas, El Catibo, El Caheo.