Circuito SJUA101C
Distribuidora EdeSur - Provincia San Juan
Mes-Año | Jun25 | May25 | Abr25 | Mar25 | Feb25 | Ene25 |
---|---|---|---|---|---|---|
Clasificación | C | C | A | A | A | B |
Clientes | 453 | 453 | 453 | 455 | 450 | 453 |
% Nivel Cobranza | 0.00% | 0.00% | 83.78% | 92.17% | 99.30% | 89.40% |
% Nivel Pérdida | 0.00% | 0.00% | -50.21% | -16.66% | -46.76% | -54.63% |
Energía Suministrada (GWh) | 0 | 0 | 0.04 | 0.04 | 0.04 | 0.04 |
Energía Facturada (GWh) | 0 | 0 | 0.06 | 0.05 | 0.05 | 0.06 |
Energía Cobrada (GWh) | 0 | 0 | 0.05 | 0.05 | 0.05 | 0.05 |
% Servicio | 96.47% | 99.03% | 98.59% | 98.61% | 99.98% | 100.00% |
% Sin Servicio | 3.53% | 0.97% | 1.41% | 1.39% | 0.02% | 0.00% |
Interrupción Programada (Hrs) | 18.00 | 7.00 | 0.00 | 0.00 | 0.00 | 1.00 |
Interrupción Ejecutada (Hrs) | 25.75 | 7.10 | 10.33 | 10.14 | 0.13 | 0.00 |
Promedio Interrupción Diarias (Hrs) | 0.85 | 0.23 | 0.34 | 0.33 | 0.00 | 0.00 |
Las Zanjas