Circuito SJOC402C
Distribuidora EdeSur - Provincia San José De Ocoa
Mes-Año | Jun25 | May25 | Abr25 | Mar25 | Feb25 | Ene25 |
---|---|---|---|---|---|---|
Clasificación | C | C | C | C | C | D |
Clientes | 328 | 328 | 329 | 328 | 324 | 331 |
% Nivel Cobranza | 0.00% | 86.42% | 88.43% | 101.25% | 57.50% | 105.88% |
% Nivel Pérdida | 0.00% | 82.14% | 82.03% | 85.35% | 74.19% | 82.63% |
Energía Suministrada (GWh) | 0 | 0.25 | 0.24 | 0.24 | 0.2 | 0.22 |
Energía Facturada (GWh) | 0 | 0.04 | 0.04 | 0.03 | 0.05 | 0.04 |
Energía Cobrada (GWh) | 0 | 0.04 | 0.04 | 0.04 | 0.03 | 0.04 |
% Servicio | 97.73% | 99.35% | 98.34% | 99.88% | 99.83% | 99.85% |
% Sin Servicio | 2.27% | 0.65% | 1.66% | 0.12% | 0.17% | 0.15% |
Interrupción Programada (Hrs) | 10.00 | 5.00 | 3.00 | 0.00 | 0.00 | 1.00 |
Interrupción Ejecutada (Hrs) | 16.57 | 4.77 | 12.12 | 0.87 | 1.23 | 1.09 |
Promedio Interrupción Diarias (Hrs) | 0.54 | 0.16 | 0.40 | 0.03 | 0.04 | 0.04 |
Las Auyamas.