Circuito SJOC402B
Distribuidora EdeSur - Provincia San José De Ocoa
Mes-Año | Abr25 | Mar25 | Feb25 | Ene25 | Dic24 | Nov24 |
---|---|---|---|---|---|---|
Clasificación | C | C | C | D | C | D |
Clientes | 3177 | 3160 | 3158 | 3150 | 3473 | 3480 |
% Nivel Cobranza | 112.23% | 98.15% | 98.84% | 87.61% | 104.86% | 98.54% |
% Nivel Pérdida | 12.99% | 14.88% | -1.96% | -2.45% | 65.35% | 57.77% |
Energía Suministrada (GWh) | 0.44 | 0.5 | 0.4 | 0.46 | 1.27 | 1.13 |
Energía Facturada (GWh) | 0.38 | 0.43 | 0.41 | 0.47 | 0.44 | 0.48 |
Energía Cobrada (GWh) | 0.43 | 0.42 | 0.4 | 0.41 | 0.46 | 0.47 |
% Servicio | 100.00% | 99.89% | 100.00% | 99.61% | 99.76% | 100.00% |
% Sin Servicio | 0.00% | 0.11% | 0.00% | 0.39% | 0.24% | 0.00% |
Interrupción Programada (Hrs) | 0.00 | 0.00 | 0.00 | 1.00 | 0.00 | 0.00 |
Interrupción Ejecutada (Hrs) | 0.00 | 0.78 | 0.03 | 2.84 | 1.77 | 0.00 |
Promedio Interrupción Diarias (Hrs) | 0.00 | 0.03 | 0.00 | 0.09 | 0.06 | 0.00 |
La Ciénaga de San José de Ocoa.