Circuito SJOC402B
Distribuidora EdeSur - Provincia San José De Ocoa
Mes-Año | Jun25 | May25 | Abr25 | Mar25 | Feb25 | Ene25 |
---|---|---|---|---|---|---|
Clasificación | C | C | C | C | C | D |
Clientes | 3185 | 3185 | 3177 | 3160 | 3158 | 3150 |
% Nivel Cobranza | 0.00% | 102.32% | 112.23% | 98.15% | 98.84% | 87.61% |
% Nivel Pérdida | 0.00% | -0.13% | 12.99% | 14.88% | -1.96% | -2.45% |
Energía Suministrada (GWh) | 0 | 0.43 | 0.44 | 0.5 | 0.4 | 0.46 |
Energía Facturada (GWh) | 0 | 0.44 | 0.38 | 0.43 | 0.41 | 0.47 |
Energía Cobrada (GWh) | 0 | 0.45 | 0.43 | 0.42 | 0.4 | 0.41 |
% Servicio | 98.50% | 99.39% | 100.00% | 99.89% | 100.00% | 99.61% |
% Sin Servicio | 1.50% | 0.61% | 0.00% | 0.11% | 0.00% | 0.39% |
Interrupción Programada (Hrs) | 10.00 | 2.00 | 0.00 | 0.00 | 0.00 | 1.00 |
Interrupción Ejecutada (Hrs) | 10.96 | 4.44 | 0.00 | 0.78 | 0.03 | 2.84 |
Promedio Interrupción Diarias (Hrs) | 0.36 | 0.15 | 0.00 | 0.03 | 0.00 | 0.09 |
La Ciénaga de San José de Ocoa.