Circuito SJOC402A
Distribuidora EdeSur - Provincia San José De Ocoa
Mes-Año | Jun25 | May25 | Abr25 | Mar25 | Feb25 | Ene25 |
---|---|---|---|---|---|---|
Clasificación | C | C | C | C | C | D |
Clientes | 242 | 242 | 244 | 242 | 243 | 246 |
% Nivel Cobranza | 0.00% | 96.93% | 97.63% | 111.66% | 96.01% | 117.62% |
% Nivel Pérdida | 0.00% | 60.36% | 91.58% | 93.08% | 90.27% | 66.11% |
Energía Suministrada (GWh) | 0 | 0.06 | 0.25 | 0.27 | 0.22 | 0.06 |
Energía Facturada (GWh) | 0 | 0.02 | 0.02 | 0.02 | 0.02 | 0.02 |
Energía Cobrada (GWh) | 0 | 0.02 | 0.02 | 0.02 | 0.02 | 0.02 |
% Servicio | 97.17% | 99.11% | 99.96% | 99.92% | 99.91% | 99.98% |
% Sin Servicio | 2.83% | 0.89% | 0.04% | 0.08% | 0.09% | 0.02% |
Interrupción Programada (Hrs) | 12.00 | 4.00 | 3.00 | 0.00 | 0.00 | 1.00 |
Interrupción Ejecutada (Hrs) | 20.67 | 6.47 | 0.26 | 0.60 | 0.68 | 0.14 |
Promedio Interrupción Diarias (Hrs) | 0.68 | 0.21 | 0.01 | 0.02 | 0.02 | 0.00 |
La Horma, Nizao, Sabana Larga, La Ciénega, El Naranjal, Parra, El Barrio San Luis y Las Clavellinas.