Circuito SCNO104A
Distribuidora EdeSur - Provincia San Cristóbal
Mes-Año | Feb19 | Ene19 | Dic18 | Nov18 | Oct18 | Sep18 |
---|---|---|---|---|---|---|
Clasificación | D | D | D | D | D | D |
Clientes | 48 | 48 | 48 | 48 | 48 | 48 |
% Nivel Cobranza | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
% Nivel Pérdida | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
Energía Suministrada (GWh) | 0 | 0 | 0 | 0 | 0 | 0 |
Energía Facturada (GWh) | 0 | 0 | 0 | 0 | 0 | 0 |
Energía Cobrada (GWh) | 0 | 0 | 0 | 0 | 0 | 0 |
% Servicio | 72.81% | 72.83% | 70.88% | 73.58% | 67.44% | 69.80% |
% Sin Servicio | 27.19% | 27.17% | 29.12% | 26.42% | 32.56% | 30.20% |
Interrupción Programada (Hrs) | 171.00 | 179.00 | 179.00 | 171.00 | 194.00 | 210.00 |
Interrupción Ejecutada (Hrs) | 198.48 | 198.32 | 212.57 | 192.88 | 237.66 | 220.48 |
Promedio Interrupción Diarias (Hrs) | 6.53 | 6.52 | 6.99 | 6.34 | 7.81 | 7.25 |
Villa Progreso 2, Villa Liberación,