Circuito SCNO101A
Distribuidora EdeSur - Provincia San Cristóbal
Mes-Año | Jun25 | May25 | Abr25 | Mar25 | Feb25 | Ene25 |
---|---|---|---|---|---|---|
Clasificación | C | C | D | D | D | A |
Clientes | 2136 | 2136 | 2137 | 2138 | 2132 | 2137 |
% Nivel Cobranza | 0.00% | 47.59% | 49.74% | 45.34% | 46.44% | 47.97% |
% Nivel Pérdida | 0.00% | 86.54% | 86.20% | 86.95% | 84.67% | 85.16% |
Energía Suministrada (GWh) | 0 | 2.53 | 2.47 | 2.59 | 2.11 | 2.3 |
Energía Facturada (GWh) | 0 | 0.34 | 0.34 | 0.34 | 0.32 | 0.34 |
Energía Cobrada (GWh) | 0 | 0.16 | 0.17 | 0.15 | 0.15 | 0.16 |
% Servicio | 93.96% | 95.95% | 96.25% | 97.79% | 98.33% | 98.04% |
% Sin Servicio | 6.04% | 4.05% | 3.75% | 2.21% | 1.67% | 1.96% |
Interrupción Programada (Hrs) | 16.00 | 16.00 | 6.00 | 9.00 | 10.00 | 7.00 |
Interrupción Ejecutada (Hrs) | 44.11 | 29.57 | 27.36 | 16.14 | 12.17 | 14.29 |
Promedio Interrupción Diarias (Hrs) | 1.45 | 0.97 | 0.90 | 0.53 | 0.40 | 0.47 |
El pomier, Los Cacaítos, Santa Maria, Boruga, Limón Dulce, Pica Pica, Los Montones, Hato Dama, Medina, La Cuchilla