Circuito SCNO101A
Distribuidora EdeSur - Provincia San Cristóbal
Mes-Año | Mar25 | Feb25 | Ene25 | Dic24 | Nov24 | Oct24 |
---|---|---|---|---|---|---|
Clasificación | D | D | A | C | A | A |
Clientes | 2132 | 2132 | 2137 | 2127 | 2133 | 2123 |
% Nivel Cobranza | 0.00% | 46.44% | 47.97% | 43.38% | 51.75% | 45.40% |
% Nivel Pérdida | 0.00% | 84.67% | 85.16% | 86.51% | 86.04% | 84.73% |
Energía Suministrada (GWh) | 0 | 2.11 | 2.3 | 2.45 | 2.36 | 2.18 |
Energía Facturada (GWh) | 0 | 0.32 | 0.34 | 0.33 | 0.33 | 0.33 |
Energía Cobrada (GWh) | 0 | 0.15 | 0.16 | 0.14 | 0.17 | 0.15 |
% Servicio | 97.79% | 98.33% | 98.04% | 96.86% | 98.23% | 97.61% |
% Sin Servicio | 2.21% | 1.67% | 1.96% | 3.14% | 1.77% | 2.39% |
Interrupción Programada (Hrs) | 9.00 | 10.00 | 7.00 | 0.00 | 6.00 | 3.00 |
Interrupción Ejecutada (Hrs) | 16.14 | 12.17 | 14.29 | 22.89 | 12.93 | 17.45 |
Promedio Interrupción Diarias (Hrs) | 0.53 | 0.40 | 0.47 | 0.75 | 0.43 | 0.57 |
El pomier, Los Cacaítos, Santa Maria, Boruga, Limón Dulce, Pica Pica, Los Montones, Hato Dama, Medina, La Cuchilla