Circuito RINC102LMI
Distribuidora EdeNorte - Provincia La Vega
Mes-Año | May25 | Abr25 | Mar25 | Feb25 | Ene25 | Dic24 |
---|---|---|---|---|---|---|
Clasificación | A | A | A | A | A | A |
Clientes | 90 | 90 | 90 | 89 | 92 | 93 |
% Nivel Cobranza | 0.00% | 74.70% | 119.26% | 76.23% | 119.71% | 99.47% |
% Nivel Pérdida | 0.00% | -0.22% | 4.60% | -43.30% | -10.04% | -9.12% |
Energía Suministrada (GWh) | 0 | 0.02 | 0.02 | 0.01 | 0.01 | 0.01 |
Energía Facturada (GWh) | 0 | 0.02 | 0.02 | 0.02 | 0.02 | 0.02 |
Energía Cobrada (GWh) | 0 | 0.01 | 0.02 | 0.01 | 0.02 | 0.02 |
% Servicio | 96.92% | 100.67% | 98.87% | 99.40% | 98.78% | 98.64% |
% Sin Servicio | 3.08% | -0.67% | 1.13% | 0.60% | 1.22% | 1.36% |
Interrupción Programada (Hrs) | 0.00 | 0.00 | 0.00 | 0.00 | 6.00 | 0.00 |
Interrupción Ejecutada (Hrs) | 22.45 | -4.92 | 8.25 | 4.35 | 8.92 | 9.94 |
Promedio Interrupción Diarias (Hrs) | 0.74 | -0.16 | 0.27 | 0.14 | 0.29 | 0.33 |
Loma Miranda, Callejon la Piedra.