Circuito RCL172
Distribuidora EdeEste - Provincia La Altagracia
Mes-Año | Abr25 | Mar25 | Feb25 | Ene25 | Dic24 | Nov24 |
---|---|---|---|---|---|---|
Clasificación | D | D | D | D | D | D |
Clientes | 2413 | 2413 | 2413 | 2413 | 2268 | 2268 |
% Nivel Cobranza | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
% Nivel Pérdida | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
Energía Suministrada (GWh) | 0 | 0 | 0 | 0 | 0 | 0 |
Energía Facturada (GWh) | 0 | 0 | 0 | 0 | 0 | 0 |
Energía Cobrada (GWh) | 0 | 0 | 0 | 0 | 0 | 0 |
% Servicio | 95.17% | 98.61% | 97.96% | 96.68% | 99.99% | 97.74% |
% Sin Servicio | 4.83% | 1.39% | 2.04% | 3.32% | 0.01% | 2.26% |
Interrupción Programada (Hrs) | 11.00 | 0.00 | 15.00 | 47.00 | 0.00 | 8.00 |
Interrupción Ejecutada (Hrs) | 35.23 | 10.18 | 14.88 | 24.22 | 0.10 | 16.50 |
Promedio Interrupción Diarias (Hrs) | 1.16 | 0.33 | 0.49 | 0.80 | 0.00 | 0.54 |
AVIACION, SAVICA (PARCIAL), SAN FRANCISCO, EL OBISPADO, LOS SOTOS, LOS SOTOS ABAJO, HAITI CHIQUITO, VILLA ESPERANZA (PARCIAL)