Circuito PIZA103
Distribuidora EdeSur - Provincia San Cristóbal
Mes-Año | Abr25 | Mar25 | Feb25 | Ene25 | Dic24 | Nov24 |
---|---|---|---|---|---|---|
Clasificación | C | C | C | A | B | A |
Clientes | 1177 | 1178 | 1189 | 1191 | 1192 | 1196 |
% Nivel Cobranza | 85.74% | 136.45% | 105.99% | 94.39% | 97.95% | 102.02% |
% Nivel Pérdida | 38.27% | 46.98% | 45.06% | 40.54% | 45.65% | 29.88% |
Energía Suministrada (GWh) | 0.78 | 0.75 | 0.63 | 0.67 | 0.73 | 0.7 |
Energía Facturada (GWh) | 0.48 | 0.4 | 0.34 | 0.4 | 0.4 | 0.49 |
Energía Cobrada (GWh) | 0.41 | 0.54 | 0.36 | 0.38 | 0.39 | 0.5 |
% Servicio | 99.03% | 97.94% | 95.02% | 92.56% | 99.85% | 97.59% |
% Sin Servicio | 0.97% | 2.06% | 4.98% | 7.44% | 0.15% | 2.41% |
Interrupción Programada (Hrs) | 9.00 | 9.00 | 21.00 | 43.00 | 3.00 | 12.00 |
Interrupción Ejecutada (Hrs) | 7.06 | 15.05 | 36.34 | 54.30 | 1.11 | 17.59 |
Promedio Interrupción Diarias (Hrs) | 0.23 | 0.49 | 1.19 | 1.79 | 0.04 | 0.58 |
Liceo Santana, Centro de Atención Primaria de Pizarrete, Mini Central Los Anones, Santana, Lucas Díaz y La Jagua.