Circuito PIZA102
Distribuidora EdeSur - Provincia Peravia
Mes-Año | Jun25 | May25 | Abr25 | Mar25 | Feb25 | Ene25 |
---|---|---|---|---|---|---|
Clasificación | B | C | D | D | D | A |
Clientes | 3724 | 3724 | 3734 | 3744 | 3771 | 3785 |
% Nivel Cobranza | 0.00% | 76.97% | 69.75% | 77.93% | 74.22% | 70.77% |
% Nivel Pérdida | 0.00% | 60.58% | 57.47% | 60.99% | 51.35% | 48.95% |
Energía Suministrada (GWh) | 0 | 1.81 | 1.62 | 1.65 | 1.34 | 1.45 |
Energía Facturada (GWh) | 0 | 0.71 | 0.69 | 0.64 | 0.65 | 0.74 |
Energía Cobrada (GWh) | 0 | 0.55 | 0.48 | 0.5 | 0.48 | 0.52 |
% Servicio | 96.92% | 97.09% | 96.91% | 97.32% | 94.90% | 91.78% |
% Sin Servicio | 3.08% | 2.91% | 3.09% | 2.68% | 5.10% | 8.22% |
Interrupción Programada (Hrs) | 12.00 | 12.00 | 15.00 | 12.00 | 21.00 | 40.00 |
Interrupción Ejecutada (Hrs) | 22.50 | 21.22 | 22.53 | 19.56 | 37.23 | 59.97 |
Promedio Interrupción Diarias (Hrs) | 0.74 | 0.70 | 0.74 | 0.64 | 1.22 | 1.97 |
Catalina, Carretón, Los Roches, Sabana Larga y el Acueducto Múltiple de la Provincia Peravia, Pizarrete, Roblegal, Juan de Sena, Las Barias Parcial.