Circuito PEDE503
Distribuidora EdeSur - Provincia Pedernales
Mes-Año | Mar25 | Feb25 | Ene25 | Dic24 | Nov24 | Oct24 |
---|---|---|---|---|---|---|
Clasificación | D | D | A | B | A | A |
Clientes | 1865 | 1865 | 1870 | 1815 | 1853 | 1857 |
% Nivel Cobranza | 0.00% | 102.51% | 100.47% | 102.31% | 95.91% | 106.65% |
% Nivel Pérdida | 0.00% | 60.22% | 56.14% | 61.05% | 56.30% | 63.33% |
Energía Suministrada (GWh) | 0 | 0.91 | 0.96 | 1.03 | 0.98 | 1.17 |
Energía Facturada (GWh) | 0 | 0.36 | 0.42 | 0.4 | 0.43 | 0.43 |
Energía Cobrada (GWh) | 0 | 0.37 | 0.43 | 0.41 | 0.41 | 0.46 |
% Servicio | 96.71% | 94.50% | 91.39% | 98.78% | 100.00% | 99.62% |
% Sin Servicio | 3.29% | 5.50% | 8.61% | 1.22% | 0.00% | 0.38% |
Interrupción Programada (Hrs) | 3.00 | 18.00 | 42.00 | 3.00 | 3.00 | 3.00 |
Interrupción Ejecutada (Hrs) | 24.02 | 40.17 | 62.83 | 8.92 | 0.00 | 2.75 |
Promedio Interrupción Diarias (Hrs) | 0.79 | 1.32 | 2.07 | 0.29 | 0.00 | 0.09 |
Savica, Centro del Pueblo de Pedernales (parcial), Las Flores, Los Cayucos, Campo de Aviación.