Circuito PEDE501
Distribuidora EdeSur - Provincia Pedernales
Mes-Año | Abr25 | Mar25 | Feb25 | Ene25 | Dic24 | Nov24 |
---|---|---|---|---|---|---|
Clasificación | D | D | D | A | B | A |
Clientes | 921 | 1682 | 1690 | 1690 | 1676 | 1681 |
% Nivel Cobranza | 92.47% | 95.17% | 109.88% | 96.57% | 109.04% | 98.65% |
% Nivel Pérdida | 35.97% | 52.07% | 52.41% | 46.09% | 52.30% | 42.13% |
Energía Suministrada (GWh) | 0.36 | 0.84 | 0.73 | 0.76 | 0.8 | 0.78 |
Energía Facturada (GWh) | 0.23 | 0.4 | 0.35 | 0.41 | 0.38 | 0.45 |
Energía Cobrada (GWh) | 0.21 | 0.39 | 0.38 | 0.39 | 0.42 | 0.44 |
% Servicio | 98.04% | 98.66% | 96.83% | 92.36% | 99.55% | 99.27% |
% Sin Servicio | 1.96% | 1.34% | 3.17% | 7.64% | 0.45% | 0.73% |
Interrupción Programada (Hrs) | 3.00 | 3.00 | 21.00 | 41.00 | 0.00 | 6.00 |
Interrupción Ejecutada (Hrs) | 14.28 | 9.75 | 23.13 | 55.80 | 3.28 | 5.33 |
Promedio Interrupción Diarias (Hrs) | 0.47 | 0.32 | 0.76 | 1.83 | 0.11 | 0.18 |
Los Altagracianos, Alcoa, Av. Santo Domingo, Av. Duarte (parcial), Bo. José Francisco Peña Gómez, INAPA, INDRHI, Centro del Pueblo (parcial), Paso de Sena, Altagracia, Los Robles, Los Altagracianos.