Circuito PALA101A
Distribuidora EdeSur - Provincia Santo Domingo
Mes-Año | Mar25 | Feb25 | Ene25 | Dic24 | Nov24 | Oct24 |
---|---|---|---|---|---|---|
Clasificación | C | C | A | A | A | A |
Clientes | 6797 | 6797 | 6807 | 6850 | 6915 | 6974 |
% Nivel Cobranza | 0.00% | 93.00% | 97.54% | 105.76% | 97.62% | 99.80% |
% Nivel Pérdida | 0.00% | 41.24% | 35.29% | 37.81% | 32.11% | 27.11% |
Energía Suministrada (GWh) | 0 | 4.14 | 4.27 | 4.71 | 4.8 | 4.59 |
Energía Facturada (GWh) | 0 | 2.43 | 2.76 | 2.93 | 3.26 | 3.35 |
Energía Cobrada (GWh) | 0 | 2.26 | 2.69 | 3.1 | 3.18 | 3.34 |
% Servicio | 98.91% | 99.58% | 99.70% | 99.06% | 98.48% | 99.20% |
% Sin Servicio | 1.09% | 0.42% | 0.30% | 0.94% | 1.52% | 0.80% |
Interrupción Programada (Hrs) | 0.00 | 0.00 | 1.00 | 0.00 | 0.00 | 0.00 |
Interrupción Ejecutada (Hrs) | 7.99 | 3.09 | 2.21 | 6.84 | 11.13 | 5.81 |
Promedio Interrupción Diarias (Hrs) | 0.26 | 0.10 | 0.07 | 0.22 | 0.37 | 0.19 |
Pantoja (parcial), Palmarejo, Villa Flores de Pantoja, Proyecto José Contreras de Pantoja, La Redención de Pantoja, Urb. Villas de Pantoja, La Hondanada, Los Humildes de Pantoja, Planta Tratamiento de la CAASD, Proyecto INVI CEA, Prados de Pantoja, La Redención, Villa El Palmar, Residencial Don Miguel, Carrtera La Isabela (parcial), Residencial Alan, Urb. Don Gregorio I, Don Gregorio III.