Circuito NEYB102J
Distribuidora EdeSur - Provincia Bahoruco
Mes-Año | Abr25 | Mar25 | Feb25 | Ene25 | Dic24 | Nov24 |
---|---|---|---|---|---|---|
Clasificación | D | D | D | B | A | B |
Clientes | 2658 | 2624 | 2612 | 2597 | 2552 | 2583 |
% Nivel Cobranza | 53.75% | 70.30% | 52.71% | 74.91% | 91.16% | 61.47% |
% Nivel Pérdida | 73.32% | 77.13% | 70.26% | 73.33% | 78.07% | 74.16% |
Energía Suministrada (GWh) | 3 | 3.1 | 2.59 | 2.99 | 3.13 | 2.71 |
Energía Facturada (GWh) | 0.8 | 0.71 | 0.77 | 0.8 | 0.69 | 0.7 |
Energía Cobrada (GWh) | 0.43 | 0.5 | 0.41 | 0.6 | 0.63 | 0.43 |
% Servicio | 98.86% | 99.52% | 99.79% | 99.97% | 99.76% | 99.11% |
% Sin Servicio | 1.14% | 0.48% | 0.21% | 0.03% | 0.24% | 0.89% |
Interrupción Programada (Hrs) | 0.00 | 0.00 | 0.00 | 1.00 | 0.00 | 0.00 |
Interrupción Ejecutada (Hrs) | 8.34 | 3.53 | 1.54 | 0.19 | 1.78 | 6.50 |
Promedio Interrupción Diarias (Hrs) | 0.27 | 0.12 | 0.05 | 0.01 | 0.06 | 0.21 |
Villa Jaragua.