Circuito NEYB102C
Distribuidora EdeSur - Provincia Bahoruco
Mes-Año | May15 | Abr15 | Mar15 | Feb15 | Ene15 | Dic14 |
---|---|---|---|---|---|---|
Clasificación | C | C | C | C | C | C |
Clientes | 0 | 992 | 978 | 994 | 1250 | 1253 |
% Nivel Cobranza | 56.28% | 44.83% | 70.96% | 70.73% | 54.75% | 39.93% |
% Nivel Pérdida | 66.70% | 69.00% | 74.91% | 64.06% | 48.88% | 39.04% |
Energía Suministrada (GWh) | 0.52 | 0.53 | 0.6 | 0.49 | 0.41 | 0.31 |
Energía Facturada (GWh) | 0.17 | 0.16 | 0.15 | 0.18 | 0.21 | 0.19 |
Energía Cobrada (GWh) | 0.1 | 0.07 | 0.11 | 0.12 | 0.11 | 0.08 |
% Servicio | 0.00% | 99.63% | 72.31% | 88.08% | 89.26% | 67.22% |
% Sin Servicio | 0.00% | 0.37% | 27.69% | 11.92% | 10.74% | 32.78% |
Interrupción Programada (Hrs) | 0.00 | 0.00 | 225.98 | 235.00 | 247.98 | 248.99 |
Interrupción Ejecutada (Hrs) | 0.00 | 2.67 | 202.11 | 87.03 | 78.37 | 239.28 |
Promedio Interrupción Diarias (Hrs) | 0.00 | 0.09 | 6.64 | 2.86 | 2.58 | 7.87 |
Villa Jaragua