Circuito MVIE105A
Distribuidora EdeSur - Provincia San Cristóbal
Mes-Año | Abr16 | Mar16 | Feb16 | Ene16 | Dic15 | Nov15 |
---|---|---|---|---|---|---|
Clasificación | C | C | C | C | C | C |
Clientes | 4351 | 4378 | 4378 | 4453 | 4450 | 4502 |
% Nivel Cobranza | 89.32% | 89.22% | 89.22% | 74.33% | 88.84% | 84.36% |
% Nivel Pérdida | 45.72% | 46.44% | 47.02% | 44.08% | 54.25% | 49.31% |
Energía Suministrada (GWh) | 1.2 | 1.2 | 1.22 | 1.14 | 1.34 | 1.32 |
Energía Facturada (GWh) | 0.65 | 0.64 | 0.64 | 0.64 | 0.61 | 0.67 |
Energía Cobrada (GWh) | 0.58 | 0.57 | 0.57 | 0.47 | 0.54 | 0.56 |
% Servicio | 66.47% | 67.74% | 75.43% | 72.51% | 70.49% | 82.66% |
% Sin Servicio | 33.53% | 32.26% | 24.57% | 27.49% | 29.51% | 17.34% |
Interrupción Programada (Hrs) | 42.00 | 45.00 | 42.00 | 27.00 | 0.00 | 12.00 |
Interrupción Ejecutada (Hrs) | 244.77 | 235.46 | 179.37 | 200.69 | 215.43 | 126.60 |
Promedio Interrupción Diarias (Hrs) | 8.05 | 7.74 | 5.90 | 6.60 | 7.08 | 4.16 |
La Colonia, Cambita, Cambita Sterling, Cambita Garabito, Santana. Cambita pueblecito, Calderón, KM 4 de Cambita, Urb. Yamilé III, Loma Verde, El Fondo, Urraca, Los Toros, La Guama, Los Talibanes, Camia Abajo, Bo. 15 de Agosto, El Cajón, Noa, Noa, Andrade Gutiérrez, Loma de los Osvaldo, INVI, Hospital de Cambita, Bo. San Francisco, Industrias Banilejas, Mucha Agua, Bo. La Torre, Los Cacaos, Paseo de las Flores, Las Antenas, Losma del Picacho, Los Fersanes.