Circuito MOCA102SAR
Distribuidora EdeNorte - Provincia Espaillat
Mes-Año | Mar25 | Feb25 | Ene25 | Dic24 | Nov24 | Oct24 |
---|---|---|---|---|---|---|
Clasificación | C | C | C | C | C | C |
Clientes | 1255 | 1255 | 1246 | 1260 | 1270 | 1274 |
% Nivel Cobranza | 0.00% | 98.47% | 88.47% | 111.51% | 90.60% | 104.10% |
% Nivel Pérdida | 0.00% | 41.71% | 35.73% | 53.18% | 40.75% | 44.95% |
Energía Suministrada (GWh) | 0 | 0.47 | 0.5 | 0.55 | 0.55 | 0.61 |
Energía Facturada (GWh) | 0 | 0.27 | 0.32 | 0.26 | 0.32 | 0.33 |
Energía Cobrada (GWh) | 0 | 0.27 | 0.28 | 0.28 | 0.29 | 0.35 |
% Servicio | 98.04% | 96.87% | 92.12% | 99.04% | 99.70% | 99.48% |
% Sin Servicio | 1.96% | 3.13% | 7.88% | 0.96% | 0.30% | 0.52% |
Interrupción Programada (Hrs) | 5.00 | 18.00 | 52.00 | 6.00 | 0.00 | 0.00 |
Interrupción Ejecutada (Hrs) | 14.34 | 22.87 | 57.50 | 6.99 | 2.21 | 3.77 |
Promedio Interrupción Diarias (Hrs) | 0.47 | 0.75 | 1.89 | 0.23 | 0.07 | 0.12 |
Santa Rosa, Camino La Soledad, Carretera La Guazuma, Carretera Santa Rosa Parcial, Tierra Dura.