Circuito METR105
Distribuidora EdeSur - Provincia Distrito Nacional
Mes-Año | Jun25 | May25 | Abr25 | Mar25 | Feb25 | Ene25 |
---|---|---|---|---|---|---|
Clasificación | A | A | A | A | A | A |
Clientes | 4207 | 4207 | 4208 | 4217 | 4233 | 4234 |
% Nivel Cobranza | 0.00% | 99.74% | 98.66% | 101.12% | 97.42% | 104.42% |
% Nivel Pérdida | 0.00% | 16.07% | 3.52% | 17.35% | -1.70% | 14.12% |
Energía Suministrada (GWh) | 0 | 5.02 | 4.48 | 4.72 | 3.98 | 4.45 |
Energía Facturada (GWh) | 0 | 4.22 | 4.32 | 3.9 | 4.04 | 3.82 |
Energía Cobrada (GWh) | 0 | 4.21 | 4.26 | 3.94 | 3.94 | 3.99 |
% Servicio | 99.97% | 99.42% | 99.49% | 99.99% | 99.41% | 99.98% |
% Sin Servicio | 0.03% | 0.58% | 0.51% | 0.01% | 0.59% | 0.02% |
Interrupción Programada (Hrs) | 0.00 | 3.00 | 8.00 | 5.00 | 0.00 | 1.00 |
Interrupción Ejecutada (Hrs) | 0.20 | 4.26 | 3.72 | 0.07 | 4.31 | 0.11 |
Promedio Interrupción Diarias (Hrs) | 0.01 | 0.14 | 0.12 | 0.00 | 0.14 | 0.00 |
Plaza de la Salud, Defensa Civil, Periódico Hoy, El Nacional, Centro Cristiano de Servicos Médicos, CEDIMAT, Naco (Parcial): Heriberto Pieter desde la Ortega y Gasset hasta la Tiradentes, Dr. Perdomo desde la Heriberto Pieter hasta la prox. la PTE. González, C/Gracita Álvarez entre C/Presidente González y C/Heriberto Pieter, C/Dr. Luis Lembert Peguero entre C/Heriberto Pieter y C/Presidente González, C/Del Carmen entre C/Heriberto Pieter y C/Orlando Martínez, Plaza Metropolitana, Ensanche La Fe (parcial), Ens. Kennedy.