Circuito METR103
Distribuidora EdeSur - Provincia Distrito Nacional
Mes-Año | Mar25 | Feb25 | Ene25 | Dic24 | Nov24 | Oct24 |
---|---|---|---|---|---|---|
Clasificación | A | A | A | A | A | A |
Clientes | 1798 | 1798 | 1794 | 1772 | 1766 | 1766 |
% Nivel Cobranza | 0.00% | 98.02% | 102.86% | 115.35% | 99.53% | 116.98% |
% Nivel Pérdida | 0.00% | 0.70% | 9.08% | 9.79% | -6.63% | 18.82% |
Energía Suministrada (GWh) | 0 | 2.42 | 2.7 | 2.87 | 2.81 | 3.49 |
Energía Facturada (GWh) | 0 | 2.41 | 2.45 | 2.59 | 3 | 2.83 |
Energía Cobrada (GWh) | 0 | 2.36 | 2.52 | 2.98 | 2.98 | 3.31 |
% Servicio | 99.88% | 99.10% | 99.99% | 99.89% | 99.43% | 99.61% |
% Sin Servicio | 0.12% | 0.90% | 0.01% | 0.11% | 0.57% | 0.39% |
Interrupción Programada (Hrs) | 0.00 | 0.00 | 1.00 | 0.00 | 0.00 | 3.00 |
Interrupción Ejecutada (Hrs) | 0.88 | 6.53 | 0.05 | 0.79 | 4.15 | 2.86 |
Promedio Interrupción Diarias (Hrs) | 0.03 | 0.21 | 0.00 | 0.03 | 0.14 | 0.09 |
Av. San Martín entre C/Lic. Tomás Mejía y Cotes y, Naco (Parcial), C/Padre Fantino Falco, C/Padre Fantino Falco desde Av. Tiradentes hasta Av. Ortega y Gasset, C/Sócrates Nolasco, C/Silvestre Aybar, C/Orlando Martínez, Centro de Entrenamiento ADOPEN, C/Interior A. Naco (Parcial): C/Padre Fantino Falco hasta la Av. Tiradentes, Av. Tiradentes desde la C/Padre Fantino Falco hasta la C/Presidente González, Plaza Naco, Hotel Radisson, C/Santa María, C/Naco 2 (detrás de Galerías de Naco), Galerías de Naco, Desarrollo RDC (Hotel Embassy Suite Hilton), Av. Lope de Vega desde la C/Padre Fantino Falco hasta antes de la C/Carlos Sánchez y Sánchez, Centro Cuesta Nacional (Lope de Vega)