Circuito METR102A
Distribuidora EdeSur - Provincia Distrito Nacional
Mes-Año | Jun25 | May25 | Abr25 | Mar25 | Feb25 | Ene25 |
---|---|---|---|---|---|---|
Clasificación | A | A | A | A | A | A |
Clientes | 884 | 884 | 881 | 882 | 883 | 883 |
% Nivel Cobranza | 0.00% | 99.24% | 93.42% | 107.96% | 93.24% | 109.49% |
% Nivel Pérdida | 0.00% | 9.86% | -6.05% | 9.20% | -10.90% | 1.98% |
Energía Suministrada (GWh) | 0 | 1.54 | 1.34 | 1.42 | 1.23 | 1.36 |
Energía Facturada (GWh) | 0 | 1.39 | 1.43 | 1.29 | 1.36 | 1.34 |
Energía Cobrada (GWh) | 0 | 1.38 | 1.33 | 1.4 | 1.27 | 1.46 |
% Servicio | 99.97% | 99.99% | 99.58% | 100.00% | 100.00% | 99.99% |
% Sin Servicio | 0.03% | 0.01% | 0.42% | 0.00% | 0.00% | 0.01% |
Interrupción Programada (Hrs) | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 1.00 |
Interrupción Ejecutada (Hrs) | 0.20 | 0.08 | 3.06 | 0.00 | 0.00 | 0.08 |
Promedio Interrupción Diarias (Hrs) | 0.01 | 0.00 | 0.10 | 0.00 | 0.00 | 0.00 |
C/ Carlos Sánchez y Sánchez, Prol. Sierva de María, Ramón Corripio, Av. Lope de Vega (parcial).