Circuito MAON104
Distribuidora EdeNorte - Provincia Valverde Mao
Mes-Año | Jun14 | May14 | Abr14 | Mar14 | Feb14 | Ene14 |
---|---|---|---|---|---|---|
Clasificación | A | A | A | A | A | A |
Clientes | 5270 | 5250 | 5232 | 4719 | 4733 | 4730 |
% Nivel Cobranza | 83.35% | 91.95% | 95.36% | 105.31% | 85.73% | 86.94% |
% Nivel Pérdida | 14.60% | 14.86% | 19.44% | 17.00% | 4.02% | 10.60% |
Energía Suministrada (GWh) | 2.29 | 2.18 | 2.15 | 1.83 | 1.58 | 1.65 |
Energía Facturada (GWh) | 1.96 | 1.85 | 1.73 | 1.52 | 1.52 | 1.48 |
Energía Cobrada (GWh) | 1.63 | 1.7 | 1.65 | 1.6 | 1.3 | 1.29 |
% Servicio | 99.03% | 99.87% | 99.87% | 99.36% | 99.39% | 99.15% |
% Sin Servicio | 0.97% | 0.13% | 0.13% | 0.64% | 0.61% | 0.85% |
Interrupción Programada (Hrs) | 5.00 | 5.00 | 0.00 | 4.00 | 0.00 | 0.00 |
Interrupción Ejecutada (Hrs) | 7.07 | 0.95 | 0.97 | 4.67 | 4.42 | 6.22 |
Promedio Interrupción Diarias (Hrs) | 0.23 | 0.03 | 0.03 | 0.15 | 0.15 | 0.20 |
Pueblo de Mao (Parcial), Barrio Militar, El Hatico, Los Cambrones, El Puente,Yerba de Guinea, El Rincón, Bo. Las Flores de Esperanza.