Circuito KIND101
Distribuidora EdeSur - Provincia Barahona
Mes-Año | Jun25 | May25 | Abr25 | Mar25 | Feb25 | Ene25 |
---|---|---|---|---|---|---|
Clasificación | A | B | D | D | D | D |
Clientes | 4084 | 4084 | 4072 | 4080 | 4135 | 4143 |
% Nivel Cobranza | 0.00% | 76.24% | 76.77% | 77.10% | 72.49% | 82.38% |
% Nivel Pérdida | 0.00% | 59.56% | 57.59% | 59.55% | 53.16% | 51.46% |
Energía Suministrada (GWh) | 0 | 1.96 | 1.79 | 1.77 | 1.52 | 1.61 |
Energía Facturada (GWh) | 0 | 0.79 | 0.76 | 0.72 | 0.71 | 0.78 |
Energía Cobrada (GWh) | 0 | 0.61 | 0.58 | 0.55 | 0.52 | 0.64 |
% Servicio | 94.43% | 97.71% | 96.10% | 98.58% | 95.41% | 91.20% |
% Sin Servicio | 5.57% | 2.29% | 3.90% | 1.42% | 4.59% | 8.80% |
Interrupción Programada (Hrs) | 25.00 | 8.00 | 12.00 | 0.00 | 18.00 | 43.00 |
Interrupción Ejecutada (Hrs) | 40.69 | 16.68 | 28.47 | 10.33 | 33.50 | 64.24 |
Promedio Interrupción Diarias (Hrs) | 1.34 | 0.55 | 0.94 | 0.34 | 1.10 | 2.11 |
Cabral, La Lista, Polo, Loma de la Hoz, El Naranjo, La Lanza, Las Auyamas