Circuito KDIE107
Distribuidora EdeSur - Provincia Distrito Nacional
Mes-Año | Jun25 | May25 | Abr25 | Mar25 | Feb25 | Ene25 |
---|---|---|---|---|---|---|
Clasificación | A | B | B | B | B | A |
Clientes | 5762 | 5762 | 5766 | 5763 | 5759 | 5757 |
% Nivel Cobranza | 0.00% | 110.29% | 86.48% | 97.42% | 93.21% | 121.71% |
% Nivel Pérdida | 0.00% | 31.07% | 11.46% | 28.91% | 18.48% | 34.19% |
Energía Suministrada (GWh) | 0 | 3.54 | 3.13 | 3.34 | 2.83 | 3.83 |
Energía Facturada (GWh) | 0 | 2.44 | 2.77 | 2.38 | 2.31 | 2.52 |
Energía Cobrada (GWh) | 0 | 2.69 | 2.4 | 2.31 | 2.15 | 3.07 |
% Servicio | 98.10% | 98.89% | 99.03% | 99.19% | 98.58% | 98.98% |
% Sin Servicio | 1.90% | 1.11% | 0.97% | 0.81% | 1.42% | 1.02% |
Interrupción Programada (Hrs) | 3.00 | 0.00 | 6.00 | 0.00 | 1.00 | 7.00 |
Interrupción Ejecutada (Hrs) | 13.89 | 8.11 | 7.09 | 5.91 | 10.34 | 7.45 |
Promedio Interrupción Diarias (Hrs) | 0.46 | 0.27 | 0.23 | 0.19 | 0.34 | 0.25 |
Av. Los Beisbolistas (parcial), Bo. Holguin de Herrera, Santa Martha, San Benito, Los Ríos (parcial), Villa Marina, Villa Aura (parcial)