Circuito KDIE106
Distribuidora EdeSur - Provincia Distrito Nacional
Mes-Año | Jun25 | May25 | Abr25 | Mar25 | Feb25 | Ene25 |
---|---|---|---|---|---|---|
Clasificación | A | B | B | B | B | A |
Clientes | 3384 | 3384 | 3382 | 3382 | 3377 | 3379 |
% Nivel Cobranza | 0.00% | 93.22% | 97.36% | 98.98% | 101.31% | 103.84% |
% Nivel Pérdida | 0.00% | 33.10% | 28.21% | 35.56% | 23.44% | 24.98% |
Energía Suministrada (GWh) | 0 | 2.22 | 1.88 | 2 | 1.58 | 1.72 |
Energía Facturada (GWh) | 0 | 1.48 | 1.35 | 1.29 | 1.21 | 1.29 |
Energía Cobrada (GWh) | 0 | 1.38 | 1.32 | 1.28 | 1.23 | 1.34 |
% Servicio | 99.14% | 99.58% | 99.86% | 99.93% | 99.88% | 95.65% |
% Sin Servicio | 0.86% | 0.42% | 0.14% | 0.07% | 0.12% | 4.35% |
Interrupción Programada (Hrs) | 3.00 | 3.00 | 0.00 | 0.00 | 0.00 | 23.00 |
Interrupción Ejecutada (Hrs) | 6.31 | 3.05 | 1.02 | 0.53 | 0.86 | 31.73 |
Promedio Interrupción Diarias (Hrs) | 0.21 | 0.10 | 0.03 | 0.02 | 0.03 | 1.04 |
Colinas de Los Ríos, Colinas del Seminario II y III, Los Guayabos, Villa Elena, Pradera Hermosa, El Ducado.