Circuito KDIE104
Distribuidora EdeSur - Provincia Santo Domingo
Mes-Año | Abr25 | Mar25 | Feb25 | Ene25 | Dic24 | Nov24 |
---|---|---|---|---|---|---|
Clasificación | C | C | C | A | A | A |
Clientes | 3815 | 3808 | 3801 | 3797 | 3795 | 3799 |
% Nivel Cobranza | 100.78% | 133.23% | 94.48% | 86.15% | 120.23% | 74.63% |
% Nivel Pérdida | 48.96% | 24.99% | 5.32% | 3.36% | 37.34% | 33.69% |
Energía Suministrada (GWh) | 1.48 | 0.93 | 0.75 | 0.82 | 1.3 | 1.32 |
Energía Facturada (GWh) | 0.75 | 0.7 | 0.71 | 0.8 | 0.81 | 0.87 |
Energía Cobrada (GWh) | 0.76 | 0.93 | 0.67 | 0.69 | 0.98 | 0.65 |
% Servicio | 98.74% | 99.56% | 96.40% | 92.18% | 99.92% | 98.57% |
% Sin Servicio | 1.26% | 0.44% | 3.60% | 7.82% | 0.08% | 1.43% |
Interrupción Programada (Hrs) | 6.00 | 0.00 | 18.00 | 40.00 | 0.00 | 6.00 |
Interrupción Ejecutada (Hrs) | 9.22 | 3.20 | 26.25 | 57.07 | 0.60 | 10.42 |
Promedio Interrupción Diarias (Hrs) | 0.30 | 0.11 | 0.86 | 1.88 | 0.02 | 0.34 |
Tierra Llana, Villa Peravia, Alameda (parcial), Almacenes Pegui Industrial, Almacenes EDESUR, C/Juan Cabral del Proyecto Cristal en el Km. 14 Aut. Duarte, Villas Naco, La Ciénaga, Los Hidalgos, La Concordia, San Miguel de Manoguayabo (Parcial).