Circuito KDIE104
Distribuidora EdeSur - Provincia Santo Domingo
| Mes-Año | Jun25 | May25 | Abr25 | Mar25 | Feb25 | Ene25 |
|---|---|---|---|---|---|---|
| Clasificación | A | B | C | C | C | A |
| Clientes | 3810 | 3810 | 3815 | 3808 | 3801 | 3797 |
| % Nivel Cobranza | 0.00% | 80.45% | 100.78% | 133.23% | 94.48% | 86.15% |
| % Nivel Pérdida | 0.00% | 57.78% | 48.96% | 24.99% | 5.32% | 3.36% |
| Energía Suministrada (GWh) | 0 | 1.74 | 1.48 | 0.93 | 0.75 | 0.82 |
| Energía Facturada (GWh) | 0 | 0.74 | 0.75 | 0.7 | 0.71 | 0.8 |
| Energía Cobrada (GWh) | 0 | 0.59 | 0.76 | 0.93 | 0.67 | 0.69 |
| % Servicio | 98.64% | 98.32% | 98.74% | 99.56% | 96.40% | 92.18% |
| % Sin Servicio | 1.36% | 1.68% | 1.26% | 0.44% | 3.60% | 7.82% |
| Interrupción Programada (Hrs) | 9.00 | 5.00 | 6.00 | 0.00 | 18.00 | 40.00 |
| Interrupción Ejecutada (Hrs) | 9.96 | 12.27 | 9.22 | 3.20 | 26.25 | 57.07 |
| Promedio Interrupción Diarias (Hrs) | 0.33 | 0.40 | 0.30 | 0.11 | 0.86 | 1.88 |
Tierra Llana, Villa Peravia, Alameda (parcial), Almacenes Pegui Industrial, Almacenes EDESUR, C/Juan Cabral del Proyecto Cristal en el Km. 14 Aut. Duarte, Villas Naco, La Ciénaga, Los Hidalgos, La Concordia, San Miguel de Manoguayabo (Parcial).