Circuito KDIE102
Distribuidora EdeSur - Provincia Santo Domingo
Mes-Año | Abr25 | Mar25 | Feb25 | Ene25 | Dic24 | Nov24 |
---|---|---|---|---|---|---|
Clasificación | D | D | D | A | A | A |
Clientes | 2805 | 2810 | 2821 | 2827 | 8115 | 8150 |
% Nivel Cobranza | 88.37% | 102.33% | 126.34% | 93.61% | 108.78% | 101.83% |
% Nivel Pérdida | 34.30% | 38.97% | 31.54% | 47.39% | 49.48% | 41.52% |
Energía Suministrada (GWh) | 2.35 | 2.48 | 2.02 | 2.85 | 4.21 | 4.09 |
Energía Facturada (GWh) | 1.54 | 1.51 | 1.38 | 1.5 | 2.13 | 2.39 |
Energía Cobrada (GWh) | 1.36 | 1.55 | 1.75 | 1.4 | 2.31 | 2.43 |
% Servicio | 99.68% | 99.43% | 95.91% | 90.00% | 99.91% | 98.45% |
% Sin Servicio | 0.32% | 0.57% | 4.09% | 10.00% | 0.09% | 1.55% |
Interrupción Programada (Hrs) | 3.00 | 0.00 | 18.00 | 46.00 | 0.00 | 0.00 |
Interrupción Ejecutada (Hrs) | 2.32 | 4.13 | 29.83 | 73.01 | 0.63 | 11.32 |
Promedio Interrupción Diarias (Hrs) | 0.08 | 0.14 | 0.98 | 2.40 | 0.02 | 0.37 |
El Olimpo, Las Caobas (Parcial), Villa Aura, Urb. Galaxia, Savica de Herrera (parcial), La Venta, Las Palmas de Herrera (parcial).