Circuito KDIE101A
Distribuidora EdeSur - Provincia Distrito Nacional
| Mes-Año | Jun25 | May25 | Abr25 | Mar25 | Feb25 | Ene25 |
|---|---|---|---|---|---|---|
| Clasificación | A | B | C | C | C | A |
| Clientes | 9333 | 9333 | 9349 | 9402 | 9467 | 9504 |
| % Nivel Cobranza | 0.00% | 101.68% | 88.25% | 108.83% | 94.22% | 105.89% |
| % Nivel Pérdida | 0.00% | 50.79% | 42.44% | 53.02% | 38.85% | 41.15% |
| Energía Suministrada (GWh) | 0 | 3.77 | 3.34 | 3.54 | 2.81 | 3.08 |
| Energía Facturada (GWh) | 0 | 1.85 | 1.92 | 1.66 | 1.72 | 1.81 |
| Energía Cobrada (GWh) | 0 | 1.88 | 1.7 | 1.81 | 1.62 | 1.92 |
| % Servicio | 99.06% | 97.89% | 99.96% | 99.71% | 99.96% | 99.83% |
| % Sin Servicio | 0.94% | 2.11% | 0.04% | 0.29% | 0.04% | 0.17% |
| Interrupción Programada (Hrs) | 0.00 | 2.00 | 0.00 | 0.00 | 0.00 | 1.00 |
| Interrupción Ejecutada (Hrs) | 6.89 | 15.38 | 0.28 | 2.11 | 0.27 | 1.24 |
| Promedio Interrupción Diarias (Hrs) | 0.23 | 0.51 | 0.01 | 0.07 | 0.01 | 0.04 |
Los Girasoles I, Los Girasoles II, Los Girasoles III, Palma Real, Los Militares, Proyecto Fairbanks, Av. Del Rio.