Circuito KDIE101A
Distribuidora EdeSur - Provincia Distrito Nacional
Mes-Año | Mar25 | Feb25 | Ene25 | Dic24 | Nov24 | Oct24 |
---|---|---|---|---|---|---|
Clasificación | C | C | A | A | A | A |
Clientes | 9467 | 9467 | 9504 | 9587 | 9614 | 9639 |
% Nivel Cobranza | 0.00% | 94.22% | 105.89% | 110.22% | 92.52% | 103.84% |
% Nivel Pérdida | 0.00% | 38.85% | 41.15% | 44.16% | 31.60% | 30.12% |
Energía Suministrada (GWh) | 0 | 2.81 | 3.08 | 3.32 | 3.16 | 2.99 |
Energía Facturada (GWh) | 0 | 1.72 | 1.81 | 1.86 | 2.16 | 2.09 |
Energía Cobrada (GWh) | 0 | 1.62 | 1.92 | 2.04 | 2 | 2.17 |
% Servicio | 99.71% | 99.96% | 99.83% | 99.99% | 99.91% | 97.55% |
% Sin Servicio | 0.29% | 0.04% | 0.17% | 0.01% | 0.09% | 2.45% |
Interrupción Programada (Hrs) | 0.00 | 0.00 | 1.00 | 0.00 | 0.00 | 0.00 |
Interrupción Ejecutada (Hrs) | 2.11 | 0.27 | 1.24 | 0.06 | 0.63 | 17.91 |
Promedio Interrupción Diarias (Hrs) | 0.07 | 0.01 | 0.04 | 0.00 | 0.02 | 0.59 |
Los Girasoles I, Los Girasoles II, Los Girasoles III, Palma Real, Los Militares, Proyecto Fairbanks, Av. Del Rio.