Circuito JUCO102A
Distribuidora EdeSur - Provincia Pedernales
| Mes-Año | Jun25 | May25 | Abr25 | Mar25 | Feb25 | Ene25 |
|---|---|---|---|---|---|---|
| Clasificación | A | B | A | A | A | A |
| Clientes | 7 | 7 | 7 | 7 | 6 | 6 |
| % Nivel Cobranza | 0.00% | 0.00% | 0.00% | 12.72% | 100.56% | 187.18% |
| % Nivel Pérdida | 0.00% | 0.00% | 0.00% | -3.71% | -17.51% | -8.64% |
| Energía Suministrada (GWh) | 0 | 0 | 0 | 0.09 | 0.08 | 0.09 |
| Energía Facturada (GWh) | 0 | 0 | 0 | 0.1 | 0.09 | 0.1 |
| Energía Cobrada (GWh) | 0 | 0 | 0 | 0.01 | 0.09 | 0.18 |
| % Servicio | 100.00% | 100.00% | 100.00% | 100.00% | 100.00% | 100.00% |
| % Sin Servicio | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| Interrupción Programada (Hrs) | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 1.00 |
| Interrupción Ejecutada (Hrs) | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Promedio Interrupción Diarias (Hrs) | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Carretera a Cabo Rojo