Circuito ISDO101
Distribuidora EdeSur - Provincia Santo Domingo
Mes-Año | Abr25 | Mar25 | Feb25 | Ene25 | Dic24 | Nov24 |
---|---|---|---|---|---|---|
Clasificación | A | A | A | A | A | A |
Clientes | 25 | 25 | 26 | 26 | 26 | 30 |
% Nivel Cobranza | 60.93% | 82.33% | 59.91% | 113.86% | 102.88% | 99.99% |
% Nivel Pérdida | -31.04% | 2.18% | -61.22% | 37.11% | 22.80% | 17.82% |
Energía Suministrada (GWh) | 0.68 | 0.66 | 0.59 | 0.66 | 0.66 | 0.7 |
Energía Facturada (GWh) | 0.89 | 0.65 | 0.96 | 0.41 | 0.51 | 0.58 |
Energía Cobrada (GWh) | 0.54 | 0.53 | 0.57 | 0.47 | 0.52 | 0.58 |
% Servicio | 99.99% | 99.95% | 99.82% | 99.68% | 99.33% | 99.13% |
% Sin Servicio | 0.01% | 0.05% | 0.18% | 0.32% | 0.67% | 0.87% |
Interrupción Programada (Hrs) | 0.00 | 0.00 | 0.00 | 2.00 | 3.00 | 0.00 |
Interrupción Ejecutada (Hrs) | 0.10 | 0.37 | 1.31 | 2.32 | 4.86 | 6.37 |
Promedio Interrupción Diarias (Hrs) | 0.00 | 0.01 | 0.04 | 0.08 | 0.16 | 0.21 |
Parque Industrial DISDO