Circuito IMBE103GUA
Distribuidora EdeNorte - Provincia Puerto Plata
| Mes-Año | Jun25 | May25 | Abr25 | Mar25 | Feb25 | Ene25 |
|---|---|---|---|---|---|---|
| Clasificación | C | C | C | C | C | C |
| Clientes | 849 | 849 | 846 | 850 | 839 | 841 |
| % Nivel Cobranza | 0.00% | 102.26% | 89.66% | 89.98% | 89.38% | 102.94% |
| % Nivel Pérdida | 0.00% | 58.14% | 47.67% | 53.66% | 47.44% | 47.80% |
| Energía Suministrada (GWh) | 0 | 0.24 | 0.21 | 0.22 | 0.19 | 0.21 |
| Energía Facturada (GWh) | 0 | 0.1 | 0.11 | 0.1 | 0.1 | 0.11 |
| Energía Cobrada (GWh) | 0 | 0.1 | 0.1 | 0.09 | 0.09 | 0.11 |
| % Servicio | 95.28% | 97.07% | 98.42% | 95.49% | 97.01% | 93.09% |
| % Sin Servicio | 4.72% | 2.93% | 1.58% | 4.51% | 2.99% | 6.91% |
| Interrupción Programada (Hrs) | 6.00 | 11.00 | 9.00 | 8.00 | 18.00 | 54.00 |
| Interrupción Ejecutada (Hrs) | 34.48 | 21.37 | 11.52 | 32.92 | 21.82 | 50.44 |
| Promedio Interrupción Diarias (Hrs) | 1.13 | 0.70 | 0.38 | 1.08 | 0.72 | 1.66 |
Gualete, Gran Diablo.