Circuito HCAP01
Distribuidora EdeEste - Provincia San Pedro De Macoris
| Mes-Año | Abr15 | Mar15 | Feb15 | Ene15 | Dic14 | Nov14 |
|---|---|---|---|---|---|---|
| Clasificación | A | A | A | A | A | A |
| Clientes | 1 | 1 | 1 | 1 | 1 | 1 |
| % Nivel Cobranza | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| % Nivel Pérdida | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| Energía Suministrada (GWh) | 0 | 0 | 0 | 0 | 0 | 0 |
| Energía Facturada (GWh) | 0 | 0 | 0 | 0 | 0 | 0 |
| Energía Cobrada (GWh) | 0 | 0 | 0 | 0 | 0 | 0 |
| % Servicio | 100.00% | 100.00% | 100.00% | 100.00% | 100.00% | 100.00% |
| % Sin Servicio | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| Interrupción Programada (Hrs) | 0.00 | 8.00 | 8.00 | 0.00 | 16.00 | 0.00 |
| Interrupción Ejecutada (Hrs) | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Promedio Interrupción Diarias (Hrs) | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
HOTEL BARCELO CAPELLA