Circuito GRBO104
Distribuidora EdeSur - Provincia San Cristóbal
Mes-Año | Abr25 | Mar25 | Feb25 | Ene25 | Dic24 | Nov24 |
---|---|---|---|---|---|---|
Clasificación | B | B | B | A | A | A |
Clientes | 629 | 629 | 629 | 617 | 617 | 595 |
% Nivel Cobranza | 104.51% | 100.54% | 78.60% | 113.96% | 119.74% | 83.26% |
% Nivel Pérdida | 13.81% | 13.31% | 11.67% | 24.61% | 10.08% | 12.21% |
Energía Suministrada (GWh) | 5.16 | 5.58 | 5.12 | 5.4 | 5.18 | 5.52 |
Energía Facturada (GWh) | 4.44 | 4.84 | 4.53 | 4.07 | 4.66 | 4.85 |
Energía Cobrada (GWh) | 4.64 | 4.87 | 3.56 | 4.64 | 5.58 | 4.03 |
% Servicio | 97.94% | 99.40% | 99.12% | 98.77% | 99.07% | 98.34% |
% Sin Servicio | 2.06% | 0.60% | 0.88% | 1.23% | 0.93% | 1.66% |
Interrupción Programada (Hrs) | 11.00 | 0.00 | 4.00 | 5.00 | 0.00 | 3.00 |
Interrupción Ejecutada (Hrs) | 15.01 | 4.38 | 6.43 | 8.95 | 6.78 | 12.10 |
Promedio Interrupción Diarias (Hrs) | 0.49 | 0.14 | 0.21 | 0.29 | 0.22 | 0.40 |
Zona Industrial de Haina: Av. Jose Francisco Peña Gomez, calles B, D, G, H, M, N, L, O, R
Julio González, Carretera Sánchez (Parcial), Concredom y Fresh Directions, Grupo Ramos (Bajos de Haina) Centro Distribución, Hospital Municipal de Haina, Urb. Gelo, Residencial el Vacacional de Haina.
Julio González, Carretera Sánchez (Parcial), Concredom y Fresh Directions, Grupo Ramos (Bajos de Haina) Centro Distribución, Hospital Municipal de Haina, Urb. Gelo, Residencial el Vacacional de Haina.