Circuito GRBO103
Distribuidora EdeSur - Provincia San Cristóbal
Mes-Año | Abr25 | Mar25 | Feb25 | Ene25 | Dic24 | Nov24 |
---|---|---|---|---|---|---|
Clasificación | C | C | C | A | A | A |
Clientes | 16354 | 16386 | 16374 | 16437 | 16447 | 16544 |
% Nivel Cobranza | 87.96% | 123.59% | 81.78% | 91.93% | 105.21% | 91.91% |
% Nivel Pérdida | 48.24% | 59.02% | 44.59% | 47.55% | 52.16% | 37.79% |
Energía Suministrada (GWh) | 6 | 6.39 | 5.04 | 5.51 | 5.95 | 5.61 |
Energía Facturada (GWh) | 3.1 | 2.62 | 2.79 | 2.89 | 2.85 | 3.49 |
Energía Cobrada (GWh) | 2.73 | 3.23 | 2.28 | 2.66 | 3 | 3.21 |
% Servicio | 97.09% | 99.26% | 96.98% | 92.36% | 97.84% | 96.91% |
% Sin Servicio | 2.91% | 0.74% | 3.02% | 7.64% | 2.16% | 3.09% |
Interrupción Programada (Hrs) | 11.00 | 4.00 | 18.00 | 40.00 | 3.00 | 6.00 |
Interrupción Ejecutada (Hrs) | 21.22 | 5.38 | 22.06 | 55.77 | 15.75 | 22.54 |
Promedio Interrupción Diarias (Hrs) | 0.70 | 0.18 | 0.73 | 1.83 | 0.52 | 0.74 |
Centro Haina, El Naranjal, Colinas del Caribe, Villa Penca, Bo. Los Lanzadores, Bo. Chino, Barsequillo (parcial), Bo. INVI-CEA, Bo. San José, Barrio Chino, Los Gringos, El Distrito de Haina.