Circuito GRAM101
Distribuidora EdeNorte - Provincia Duarte
Mes-Año | May25 | Abr25 | Mar25 | Feb25 | Ene25 | Dic24 |
---|---|---|---|---|---|---|
Clasificación | A | A | A | A | A | A |
Clientes | 1 | 1 | 1 | 1 | 1 | 1 |
% Nivel Cobranza | 0.00% | 100.00% | 207.58% | 0.00% | 100.00% | 216.11% |
% Nivel Pérdida | 0.00% | -4.30% | 14.25% | -7.57% | -3.12% | 6.32% |
Energía Suministrada (GWh) | 0 | 0.37 | 0.38 | 0.33 | 0.35 | 0.36 |
Energía Facturada (GWh) | 0 | 0.38 | 0.33 | 0.35 | 0.36 | 0.34 |
Energía Cobrada (GWh) | 0 | 0.38 | 0.68 | 0 | 0.36 | 0.73 |
% Servicio | 100.00% | 99.20% | 99.99% | 99.82% | 99.98% | 99.70% |
% Sin Servicio | 0.00% | 0.80% | 0.01% | 0.18% | 0.02% | 0.30% |
Interrupción Programada (Hrs) | 6.00 | 6.00 | 0.00 | 6.00 | 0.00 | 0.00 |
Interrupción Ejecutada (Hrs) | 0.00 | 5.83 | 0.10 | 1.28 | 0.13 | 2.22 |
Promedio Interrupción Diarias (Hrs) | 0.00 | 0.19 | 0.00 | 0.04 | 0.00 | 0.07 |
Grupo Ramos (La Sirena San Fco. ).