Circuito GALL114MCE
Distribuidora EdeNorte - Provincia Valverde Mao
Mes-Año | Sep13 | Ago13 | Jul13 | Jun13 | May13 | Abr13 |
---|---|---|---|---|---|---|
Clasificación | B | B | B | B | B | B |
Clientes | 525 | 525 | 526 | 514 | 507 | 506 |
% Nivel Cobranza | 0.00% | 149.97% | 56.84% | 84.40% | 100.39% | 93.33% |
% Nivel Pérdida | 0.00% | 60.13% | 46.64% | 29.71% | 52.67% | 50.08% |
Energía Suministrada (GWh) | 0 | 0.29 | 0.28 | 0.28 | 0.29 | 0.22 |
Energía Facturada (GWh) | 0 | 0.12 | 0.15 | 0.2 | 0.14 | 0.11 |
Energía Cobrada (GWh) | 0 | 0.18 | 0.09 | 0.17 | 0.14 | 0.1 |
% Servicio | 74.13% | 72.13% | 71.30% | 75.85% | 70.62% | 75.69% |
% Sin Servicio | 25.87% | 27.87% | 28.70% | 24.15% | 29.38% | 24.31% |
Interrupción Programada (Hrs) | 179.92 | 182.00 | 186.00 | 168.00 | 186.00 | 174.00 |
Interrupción Ejecutada (Hrs) | 188.85 | 203.45 | 209.49 | 176.30 | 214.50 | 177.46 |
Promedio Interrupción Diarias (Hrs) | 6.21 | 6.69 | 6.89 | 5.80 | 7.05 | 5.83 |
Calle M esq. Calle B cerro alto