Circuito ELPI102A
Distribuidora EdeSur - Provincia Elías Piña
Mes-Año | Jun25 | May25 | Abr25 | Mar25 | Feb25 | Ene25 |
---|---|---|---|---|---|---|
Clasificación | A | B | C | C | C | B |
Clientes | 2308 | 2308 | 2314 | 2318 | 2313 | 2312 |
% Nivel Cobranza | 0.00% | 89.08% | 72.33% | 74.76% | 74.59% | 77.29% |
% Nivel Pérdida | 0.00% | 52.25% | 42.75% | 52.89% | 49.44% | 41.16% |
Energía Suministrada (GWh) | 0 | 0.8 | 0.74 | 0.78 | 0.72 | 0.7 |
Energía Facturada (GWh) | 0 | 0.38 | 0.42 | 0.37 | 0.36 | 0.41 |
Energía Cobrada (GWh) | 0 | 0.34 | 0.31 | 0.27 | 0.27 | 0.32 |
% Servicio | 97.08% | 99.04% | 97.71% | 97.11% | 97.16% | 94.22% |
% Sin Servicio | 2.92% | 0.96% | 2.29% | 2.89% | 2.84% | 5.78% |
Interrupción Programada (Hrs) | 13.00 | 2.00 | 0.00 | 0.00 | 0.00 | 1.00 |
Interrupción Ejecutada (Hrs) | 21.33 | 7.01 | 16.69 | 21.11 | 20.76 | 42.18 |
Promedio Interrupción Diarias (Hrs) | 0.70 | 0.23 | 0.55 | 0.69 | 0.68 | 1.39 |
Pedro Santana, Bánica, Sabana Larga, Hato Viejo, Higuero, Sabana Mula, Sabana Cruz.