Circuito ELPI102A
Distribuidora EdeSur - Provincia Elías Piña
Mes-Año | Abr25 | Mar25 | Feb25 | Ene25 | Dic24 | Nov24 |
---|---|---|---|---|---|---|
Clasificación | C | C | C | B | A | B |
Clientes | 2314 | 2318 | 2313 | 2312 | 2318 | 2326 |
% Nivel Cobranza | 72.33% | 74.76% | 74.59% | 77.29% | 73.61% | 81.61% |
% Nivel Pérdida | 42.75% | 52.89% | 49.44% | 41.16% | 50.13% | 47.62% |
Energía Suministrada (GWh) | 0.74 | 0.78 | 0.72 | 0.7 | 0.78 | 0.71 |
Energía Facturada (GWh) | 0.42 | 0.37 | 0.36 | 0.41 | 0.39 | 0.37 |
Energía Cobrada (GWh) | 0.31 | 0.27 | 0.27 | 0.32 | 0.29 | 0.3 |
% Servicio | 97.71% | 97.11% | 97.16% | 94.22% | 98.24% | 98.24% |
% Sin Servicio | 2.29% | 2.89% | 2.84% | 5.78% | 1.76% | 1.76% |
Interrupción Programada (Hrs) | 0.00 | 0.00 | 0.00 | 1.00 | 0.00 | 0.00 |
Interrupción Ejecutada (Hrs) | 16.69 | 21.11 | 20.76 | 42.18 | 12.88 | 12.81 |
Promedio Interrupción Diarias (Hrs) | 0.55 | 0.69 | 0.68 | 1.39 | 0.42 | 0.42 |
Pedro Santana, Bánica, Sabana Larga, Hato Viejo, Higuero, Sabana Mula, Sabana Cruz.