Circuito COHE103D
Distribuidora EdeSur - Provincia Santo Domingo
| Mes-Año | Jun20 | May20 | Abr20 | Mar20 | Feb20 | Ene20 |
|---|---|---|---|---|---|---|
| Clasificación | A | A | A | A | A | A |
| Clientes | 248 | 248 | 248 | 248 | 248 | 248 |
| % Nivel Cobranza | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| % Nivel Pérdida | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| Energía Suministrada (GWh) | 0 | 0 | 0 | 0 | 0 | 0 |
| Energía Facturada (GWh) | 0 | 0 | 0 | 0 | 0 | 0 |
| Energía Cobrada (GWh) | 0 | 0 | 0 | 0 | 0 | 0 |
| % Servicio | 98.91% | 99.80% | 99.87% | 99.85% | 99.80% | 100.00% |
| % Sin Servicio | 1.09% | 0.20% | 0.13% | 0.15% | 0.20% | 0.00% |
| Interrupción Programada (Hrs) | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Interrupción Ejecutada (Hrs) | 7.95 | 1.47 | 0.93 | 1.07 | 1.47 | 0.00 |
| Promedio Interrupción Diarias (Hrs) | 0.26 | 0.05 | 0.03 | 0.04 | 0.05 | 0.00 |
PLAY DE GUAJIMIA