Circuito CNP808
Distribuidora EdeEste - Provincia Distrito Nacional
Mes-Año | Abr24 | Mar24 | Feb24 | Ene24 | Dic23 | Nov23 |
---|---|---|---|---|---|---|
Clasificación | A | A | A | A | A | A |
Clientes | 195 | 195 | 195 | 194 | 189 | 185 |
% Nivel Cobranza | 0.00% | 64.35% | 103.07% | 99.15% | 100.86% | 100.25% |
% Nivel Pérdida | 0.00% | 30.60% | 45.05% | 43.81% | 45.29% | 43.99% |
Energía Suministrada (GWh) | 0 | 3.04 | 2.70 | 2.89 | 2.86 | 2.90 |
Energía Facturada (GWh) | 0 | 2.11 | 1.48 | 1.62 | 1.57 | 1.62 |
Energía Cobrada (GWh) | 0 | 1.36 | 1.53 | 1.61 | 1.58 | 1.63 |
% Servicio | 99.98% | 100.00% | 100.00% | 100.00% | 99.83% | 100.00% |
% Sin Servicio | 0.02% | 0.00% | 0.00% | 0.00% | 0.17% | 0.00% |
Interrupción Programada (Hrs) | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Interrupción Ejecutada (Hrs) | 0.12 | 0.00 | 0.00 | 0.00 | 1.25 | 0.00 |
Promedio Interrupción Diarias (Hrs) | 0.00 | 0.00 | 0.00 | 0.00 | 0.04 | 0.00 |
SAMBIL