Circuito CHIV104
Distribuidora EdeNorte - Provincia Duarte
Mes-Año | Mar25 | Feb25 | Ene25 | Dic24 | Nov24 | Oct24 |
---|---|---|---|---|---|---|
Clasificación | A | A | A | A | A | A |
Clientes | 10114 | 10114 | 10176 | 10231 | 10294 | 10247 |
% Nivel Cobranza | 0.00% | 97.50% | 100.96% | 108.72% | 103.67% | 100.23% |
% Nivel Pérdida | 0.00% | 12.75% | 17.11% | 16.77% | 7.22% | 18.80% |
Energía Suministrada (GWh) | 0 | 2.36 | 2.6 | 2.58 | 2.7 | 3.45 |
Energía Facturada (GWh) | 0 | 2.06 | 2.16 | 2.15 | 2.51 | 2.8 |
Energía Cobrada (GWh) | 0 | 2.01 | 2.18 | 2.34 | 2.6 | 2.81 |
% Servicio | 99.88% | 99.88% | 99.65% | 99.77% | 99.75% | 98.33% |
% Sin Servicio | 0.12% | 0.12% | 0.35% | 0.23% | 0.25% | 1.67% |
Interrupción Programada (Hrs) | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Interrupción Ejecutada (Hrs) | 0.88 | 0.91 | 2.55 | 1.71 | 1.85 | 12.18 |
Promedio Interrupción Diarias (Hrs) | 0.03 | 0.03 | 0.08 | 0.06 | 0.06 | 0.40 |
Ercilia Pepín, Ensanche San Martín de Porres, Ensanche Duarte, Madrigal. Rabo de Chivo, Ventura Grullon, Urb. Jenifer, Urb. Abreu, Avenida Libertad, Hospital San Vicente de Paul, Barrio San Vicente, Rivera del Jaya, Guzman, Urb. Turin Fernadez, Villa Olimpia, Villa Palma, Minguita, Ugamba, Los Platanitos.